Standing Committee on Public Works: Nuclear Waste 
April 1999

NUCLEAR WASTES & SPENT NUCLEAR FUEL

Summary

The transport and reprocessing of spent nuclear fuel; the return of radioactive wastes 
from reprocessing; the storage and disposal of the wastes from isotope production; 
the disposal of the low-level wastes and the decommissioning of the reactor and 
associated facilities will have significant cost implications for the proposed new 
reactor. These costs have to be considered by the Parliamentary Standing Committee 
on Public Works (the Committee) in conjunction with the new reactor proposal. (1) 
This submission does not cover the environmental and social implications of current 
nuclear waste disposal plans - but looks at their viability and what might happen if 
they do not proceed.

It is estimated that approximately A$80 million - an amount equal to nearly one 
quarter of the capital cost of the $286 for the new reactor itself - will be set 
aside to cover the transport to France of spent fuel, its reprocessing and the cost
of returning the resulting waste. This does not cover the possibility of remote
storage prior to transport to Europe, or the storage of the waste on return to
Australia and its final disposal

The Australian Nuclear Science and Technology Organisation (ANSTO) was allowed 
to negotiate the contract for the reprocessing contract without any independent
Parliamentary oversight. It is not known if the contract contains 'cost-plus' clauses 
through which the overseas reprocessor can automatically increase costs for additional 
environmental, technical or health and safety requirements that they or the regulatory 
agencies, may request. There is no information available on what early termination 
arrangements might have been included in the contracts - or whether there is a 'iron-
clad' guarantee that France will accept all of the spent fuel from the proposed new 
reactor.

The Committee should be aware there are serious questions over whether or not all 
the spent fuel from the proposed new reactor will go for reprocessing overseas. 
There is a possibility that some, if not all, of it will stay in Australia and be 
'conditioned' here. This matter has already been raised by ANSTO, which has itself 
previously raised the possibility that the reprocessing plants currently operating
might not remain open to receive spent fuel over the life of the proposed reactor.
If the spent fuel remains in Australia for conditioning it will have major costs 
implications for the new reactor.

(1) Proposed Replacement Nuclear Research Reactor, statement of evidence to
the Parliamentary Standing Committee on Public Works, ANSTO, February 1999.

This publication is only available at Laka on paper, not as pdf.
You can borrow the publication or request a copy. When we're available, this is possible for a small fee.