From the publication:

AFTER THIRTEEN YEARS, PRODUCTION BEGINS. 
The production phase has begun at Olympic Dam, bringing a 13-year dream to 
fruition. At the mine site, 500 tonnes of ore is coming to the surface every hour 
via the Whenan Shaft. At the nearby processing plant, copper cathode, uranium 
oxide, gold and silver are being produced. Some 13 kilometres to the south, 
among the undulating sand dunes and Callitris Pine trees of South Australia's 
mid-north, the new township of Roxby Downs is flourishing. The entire workforce 
of 800 is on site and Olympic Dam is a reality. About $750 million has been spent 
to get to the production stage - on time and on budget. The Olympic Dam deposit, 
discovered in 1975, is huge by any standard. Some 150 discrete ore zones, scattered 
throughout an envelope measuring seven kilometres by four kilometres by a 
kilometre deep, contain an indicated probable in situ reserve of 450 million tonnes 
of economic ore. Thirty kilometres of underground tunnels already have been 
developed and more than one million tonnes of ore extracted using modern 
equipment and bulk-stopping methods. In the initial