Publication Laka-library:
Missing the Path to "Cleanup": Smoke, mirrors, and contamination: DOE's contractor Intergration Team Report (1998)
| Author | Alliance for Nuclear Accountability |
| Date | May 1998 |
| Classification | 3.01.5.30/37 (UNITED STATES - GENERAL NUCLEAR WEAPONS PLANTS + CLEAN UP) |
| Front | ![]() |
From the publication:
MISSING THE PATII TO "CLEANUP" SMOKE, MIRRORS, AND CONTAMINATION: DOE'S CONTRACTOR INTEGRATION TEAM REPORT (CITR) By Todd Martin Hanford Environmental Action League In July 1996, the Department of Energy chartered a government contractor-led group, known as the Complex Wide Environmental Management (EM) Integration Team, to develop alternatives that meet the EM mission. A discussion draft of" A ContractorReport to the Department of Energy on EM Baseline Programs and Integration Opportunities" (Contractor Integration Team Report, or CITR) was released in May 1997. The team's goal was to find ways to "get the job done at an earlier date and at a lower cost" (p.1). In the CITR, the team presented 36 "integration opportunities" (25 of which DOE has decided should be looked at further) which it claimed could save tens of billions of dollars. According to the CITR, these integration opportunities are " ... technically defensible solutions which reduce cost, accelerate schedules, and result in no significant increase in risk." (p. 2). However, the CITR fails on all counts. Most of the alleged savings have nothing to do with "integration" but rely on haphazard movement of waste around the country, dramatically altered cleanup requirements, and miraculous technology breakthroughs. The report's recommendations are not technically defensible, will not reduce cost, will not accelerate schedules, and will result in significant increases in risk. It is nothing more than smoke and mirrors.
This publication is only available at Laka on paper, not as pdf.
You can borrow the publication or request a copy. When we're available, this is possible for a small fee.

