Publication Laka-library:
Leningrad Nuclear Power Plant
| Author | |
| Date | |
| Classification | 2.34.8.60/02 (RUSSIA - SOSNOVY BOR (ST. PETERSBURG / LENINGRAD)) |
| Front | ![]() |
From the publication:
LENINGRAD NUCLEAR POWER PLANT LENINGRAD NPP is situated at a distance of 80 km to the west of St Petersburg on the coast of the Gulf of Finland. Nowadays the LNPP generates more than a half of the total electric power to the system of the Lenenegro Power Grid. The Plant is, also, a heat source for the town of Sosnovy Bor. Water-cooled graphite-moderated high-power channel type (RBMK-1000) nuclear reactors on thermal neutrons are installed at the Leningrad NPP. The Plant has 4 power units, 1,000 MWe of electric power each. Unit 1 was put into operation in 1973, unit 4- in 1981. Each power unit includes: a RBMK-1 000 nuclear reactor with a circulation circuit and auxiliary systems, steam and condensate feeding circuits and two K-500-65 turbines with TVV-500-2 turbogenerators, 500 MWe of electric power each. The LNPP is a direct cycle type plant. The steam to be delivered to the turbines is generated inside the reactor as a result of the boiling water passing through it. The design annual electric output of the LNPP is 28 billion kWh. The LNPP internal load is 8-8.5% of the generated power. Starting in 1982 and up to 1988 inclusive the electricity production exceeded the project figures and in 1985-86 this figure was as much as 29,4 billion kWh. The capacity factor during this period came to 94%. The longest unit cycle - eighteen months - was achieved in 1989-90 at Unit 3. Since the beginning of its operation and up to the end of 1992 the Leningrad NPP has generated about 400 billion kWt into the LENENERGO power grid.
This publication is only available at Laka on paper, not as pdf.
You can borrow the publication or request a copy. When we're available, this is possible for a small fee.

