Publication Laka-library:
Barsebeck. Technical information
| Author | Sydkraft |
| Date | |
| Classification | 2.07.9.90/13 (SWEDEN - FACILITIES) |
| Front | ![]() |
From the publication:
Barsebeck nuclear power plant Technical information The South Swedish Power Company, known as Sydkraft, is the largest private owned electrical power company in Sweden and Sydkraft is responsible for the electrical power supply in southern Sweden. The production is partly from hydroelectric plants and partly from different types of thermal power plants. It was not evident from the outset that Barsebeck would be a nuclear power station; an oil-fired power station was given careful consideration. However, the need for a power station capable of supplying 2 x 600 MW was unquestionable. In this size range, and with the proposed utilisation time of more than 6.500 hours per year, nuclear power was the best choice both economically and environmentally. Before the site of the power plant was chosen at Barsebeck, almost 40 possible sites along the coast of southern Sweden had been considered. Sydkraft, together with local and regional authorities and representatives of some environmental interests carried out a detailed assessment of the possibilities for connecting the power station to the grid, of obtaining cooling water, transporting heavy components and avoiding disturbance to built up areas. Agreement on the choice of site was considerable. In May 1970 Sydkraft ordered one 570 MWe boiling water reactor (BWR) from ASEA-ATOM. Together with the reactor, its first fuel loading and its auxiliary systems was also ordered the control equipment and supporting electrical power systems. The complete turbine and generator plant was ordered from STAL-LAVAL. In june 1972 Sydkraft ordered another power plant identical to the first. The first unit was put into commercial operation on the 1st of July 1975, exactly on schedule according to the contract. The time from the beginning of erection to commercial operation was 52 months. The start of commercial operation for the second unit was in the beginning of June 1977, three weeks before scheduled time.
This publication is only available at Laka on paper, not as pdf.
You can borrow the publication or request a copy. When we're available, this is possible for a small fee.

