Barsebeck nuclear power plant
Technical information

The South Swedish Power Company, known as Sydkraft, is the largest private 
owned electrical power company in Sweden and Sydkraft is responsible for the 
electrical power supply in southern Sweden. The production is partly from 
hydroelectric plants and partly from different types of thermal power plants.
It was not evident from the outset that Barsebeck would be a nuclear power station; 
an oil-fired power station was given careful consideration. However, the need for 
a power station capable of supplying 2 x 600 MW was unquestionable. In this size 
range, and with the proposed utilisation time of more than 6.500 hours per year, 
nuclear power was the best choice both economically and environmentally.
Before the site of the power plant was chosen at Barsebeck, almost 40 possible sites 
along the coast of southern Sweden had been considered. Sydkraft, together with 
local and regional authorities and representatives of some environmental interests 
carried out a detailed assessment of the possibilities for connecting the power station 
to the grid, of obtaining cooling water, transporting heavy components and avoiding 
disturbance to built up areas. Agreement on the choice of site was considerable.
In May 1970 Sydkraft ordered one 570 MWe boiling water reactor (BWR) from 
ASEA-ATOM. Together with the reactor, its first fuel loading and its auxiliary 
systems was also ordered the control equipment and supporting electrical power 
systems. The complete turbine and generator plant was ordered from STAL-LAVAL.
In june 1972 Sydkraft ordered another power plant identical to the first.
The first unit was put into commercial operation on the 1st of July 1975, exactly 
on schedule according to the contract. The time from the beginning of erection to 
commercial operation was 52 months.
The start of commercial operation for the second unit was in the beginning of 
June 1977, three weeks before scheduled time.