Publication Laka-library:
Transmission from Torness (1981)
| Author | SSEB |
| Date | February 1981 |
| Classification | 2.05.8.50/02 (UNITED KINGDOM - TORNESS) |
| Front | ![]() |
From the publication:
SOUTH OF SCOTLAND ELECTRICITY BOARD TRANSMISSION FROM TORNESS This leaflet outlines the main factors which influenced the Board's proposals for connections from Torness to the transmission system. It also gives some other background information on transmission of electricity. INTRODUCTION Nuclear power stations are needed to supplement coal for producing electricity to meet consumers' demands. SSEB derive present supplies of nuclear based energy from their nuclear stations at Hunterston in Ayrshire and from the British Nuclear Fuels Limited's station at Chapelcross in Dumfriesshire. The magnox stations at Hunterston and Chapelcross have been in operation since the early 1960s. Both represent significant steps on the road to the peaceful use of atomic energy and both have helped to make it possible for Scottish consumers to obtain their electricity at a lower average price per unit than is paid by consumers elsewhere in the United Kingdom. The Board's second nuclear power station, Hunterston 'B', first supplied power to the grid in 1976 and has greatly boosted supplies of nuclear energy to Scottish consumers. Torness will be the Board's third nuclear power station and its two 660 megawatt reactor units are scheduled to be operational in 1987 and 1988. From Torness a new supply of nuclear based electricity will be available close to the load centres in the east of the Board's network.
This publication is only available at Laka on paper, not as pdf.
You can borrow the publication or request a copy. When we're available, this is possible for a small fee.

