date  | INES | title | location |
23-01-1990 | INES 2 | REACTOR COOLANT LEAK DURING ON POWER REFUELLING DUE TO FUELLLING MACHINE DROP | BRUCE-4, Canada |
31-05-1991 | INES 2 | INCORRECT CALIBRATION OF SHUTDOWN SYSTEM AND TWO REGIONAL OVERPOWER DETECTORS | POINT LEPREAU, Canada |
19-09-1991 | INES 1 | FUEL BUNDLE DAMAGE DURING TRANSFER TO SPENT FUEL BAY | GENTILLY-2, Canada |
18-01-1992 | INES 1 | AN IMPORTANT LOSS OF COMMUNICATIONS IN MAIN CONTROL ROOM | LAGUNA VERDE-1, Mexico |
09-05-1992 | INES 1 | REACTOR SHUTDOWN BY TECHNICAL SPECIFICATIONS APPLICATION (UNUSUAL EVENT) | LAGUNA VERDE-1, Mexico |
13-05-1992 | INES 1 | RECIRCULATION TRANSIENT WITH A SUDDEN INCREASE IN POWER OVER 100% | LAGUNA VERDE-1, Mexico |
28-05-1992 | INES 1 | A NON USUAL EVENT DUE TO THE LIBERATION OF GASES INSIDE THE PLANT | LAGUNA VERDE-1, Mexico |
18-09-1992 | INES 1 | LOSS OF INTERNAL POWER DUE TO THE TRIP OF THE MAIN TRANSFORMER (T-1) | LAGUNA VERDE-1, Mexico |
07-02-1993 | [N/A] | UNAUTHORIZED INTRUDER INTO PLANT PROTECTED AREA WHILE OPERATING AT 100 PERCENT POWER | THREE MILE ISLAND-1, United States of America |
15-02-1993 | INES 0 | UNIT SHUTDOWN DUE TO HEAVY WATER LEAK AT A FUELLING MACHINE | DARLINGTON-2, Canada |
05-03-1993 | INES 1 | UNITS DERATED TO 60% REACTOR POWER DUE TO SAFETY ANALYSIS CONCERNS | BRUCE-1, Canada |
14-03-1993 | INES 1 | PVNGS 2 STEAM GENERATOR TUBE RUPTURE | PALO VERDE-2, United States of America |
15-03-1993 | INES 0 | ZION UNIT 2 LOSS OF NSSS CONTROL ROOM ANNUNCIATORS | ZION-2, United States of America |
26-03-1993 | [N/A] | PERRY UNIT 1 MAIN SERVICE WATER PIPE BREAK | PERRY-1, United States of America |
24-04-1993 | INES 0 | EXCESSIVE FEEDWATER REGULATING VALVE OSCILLATIONS CAUSE WATER HAMMER INDUCED VIBRATION OF THE MAIN FEEDWATER PIPING | NORTH ANNA-2, United States of America |
16-08-1993 | [N/A] | MINOR FIRE INVOLVING A SAFETY RELATED SYSTEM | H.B. ROBINSON-2, United States of America |
14-09-1993 | INES 0 | LOSS OF OFF-SITE POWER AND REACTOR SCRAM | LASALLE-1, United States of America |
04-01-1994 | INES 2 | POWER EXCURSION AT MCMASTER NUCLEAR RESEARCH REACTOR DURING FUEL LOADING | MCMASTER RESEARCH REACTOR, Canada |
07-04-1994 | INES 1 | PLANT TRANSIENT INITIALLY CAUSED BY THE LOSS OF CIRCULATING WATER PUMPS DUE TO HIGH MARSH GRASS/DEBRIS CONCENTRATIONS | SALEM-1, United States of America |
06-06-1994 | [N/A] | MINOR FIRE INVOLVING A SAFETY RELATED SYSTEM | H.B. ROBINSON-2, United States of America |
10-12-1994 | INES 2 | SMALL LOCA DUE TO REACTOR COOLANT RELIEF VALVE FAILURE | PICKERING-2, Canada |
13-02-1995 | [N/A] | CARBON DIOXIDE RELEASE TO A PLANT VITAL AREA | H.B. ROBINSON-2, United States of America |
25-03-1995 | [N/A] | GASEOUS RELEASE FROM NEARBY CHEMICAL PLANT | WATERFORD-3, United States of America |
14-05-1995 | INES 1 | SPURIOUS OPENING OF REACTOR COOLANT LIQUID RELIEF VALVE | BRUCE-5, Canada |
20-06-1995 | INES 0 | LEAK FROM LIFTING CHARGING PUMP RELIEF VALVE | H.B. ROBINSON-2, United States of America |
20-07-1995 | INES 0 | AMMONIA RELEASE FROM NEARBY CHEMICAL PLANT | WATERFORD-3, United States of America |
04-09-1995 | INES 2 | PRESSURIZER DRAIN VALVE FAILURE CAUSING HEAT TRANSPORT SYSTEM LEAKS AND FORCED OUTAGE | GENTILLY-2, Canada |
04-10-1995 | INES 0 | SALEM UNIT 1 LOSS OF CONTROL ROOM ANNUNCIATORS | SALEM-1, United States of America |
31-10-1995 | INES 1 | HIGH RADIATION LEVELS IN REACTOR BUILDING | LASALLE-1, United States of America |
30-01-1996 | INES 2 | PARTIAL LOSS OF ESSENTIAL SERVICE WATER DUE TO FRAZIL ICE ON INTAKE TRASH RACKS | WOLF CREEK, United States of America |